| Locating policies - The yellow copy of the locate sheet must be on site with the person doing the excavating at all times.
- Eighteen inches either side of a flag or paint mark is considered a correct location.
- All utilities must be exposed and identified as the correct utility before crossing over, under or paralleling within 18 inches of any existing utility.
- Pothole has to be where the excavation is going to cross the utility.
- If utility lines are not found on or within 18 inches of either side of the marks while exposing before excavation, then Springs Utilities locating should be notified at 448-4800 to help determine the correct location.
- All electric and fiber optic duct banks should be exposed for proper width and depth before crossing over and under the duct bank.
- All damages must be reported immediately - 24 hours a day, 7 days a week - to the Utility Notification Center of Colorado (UNCC) at 8-1-1 and Springs Utilities at 448-4800 for direct response to the damage.
- Larger jobs, over 600 feet, are classified as continuous projects and require a time schedule worked out with Springs Utilities locating before excavation begins. Telephone and cable will be located by private companies.
- The locate marks of any Springs Utilities-owned fiber are valid for 30 calendar days from the day marked, as long as the marks are still clearly visible. The excavator is responsible for maintaining the located marks for the entire excavation period. Do not dig if no marks are visible. Call UNCC at 8-1-1 for re-marks.
Summary of Senate Bill 184. Also available in print (Excavators Handbook) from UNCC . 
|