You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Residential
Business
Work With Us
Payment Locations
|
Contact Us
|
Careers
Suppliers/Contracting
Investment recovery
Surplus auction
Procurement & contract services
Contractor safety
Registration & bid opportunities
Supplier diversity program
Supplier information forms
Safe Digging
811 before you dig
Best Practices Field Manual
Engineering Locate Policy
Excavating Civil Penalties
FAQs
Pipeline Association for Public Awareness
Economic Development
Economic Development overview
Featured properties
Our services
Our team
Partners
Target industries
Backflow Prevention
Online Test Tracking & Reporting (OTTR)
Overview
Regulations
Testers
Building/Development
Construction & utility connection
Building plan set process
Building plan set review
Development charges
Forms
Easements
Forms
Standard procedures
Land development
Forms
Land development review flowchart
Request a FIMS map
Request an as-built drawing
Request service availability letter
Line extensions & standards
Construction drawing review
Forms
Standards & bulletins
Regulations & rates
Charges & fees
City code
Tariffs
Resources
Contact us
Forms
Industrial Pretreatment
Fat, oil & grease
Liquid waste hauler program
Mercury
Sand/Oil interceptors
Significant industrial users
Silver source control program
Libraries
Lists
Pictures
Business
Residential
Work With Us
Surplus auction
testvideopage
Volunteering in our community
Water main repairs require special breed
Efficiency whitepapers
Accessibility
Benefits of community ownership
Benefits of community ownership
Carbon monoxide
Contact Us
Contractor safety
Copyright and privacy
Forms
Currently selected
Drought persists
Frozen water lines
Lighting
Martin Drake Power Plant
Forms
Forms
Page Image
Image Caption
Page Content
Request for:
As-built drawing
Attachment to streetlight pole
Attachment to utility pole
FIMS map
Fire flow report
Hyrdraulic line grade
Removal of utilities for demolition or construction
Service availability letter
Temporary water service
Easements
Easement electronic submittal
Permanent easement agreement checklist
Submittal & review procedures for easements by separate instrument
FO2A Permanent easement agreement - Corporation (Word)
FO2B Permanent easement agreement - LLC, LLP, etc. (Word)
FO2C Permanent easement agreement - Individual (Word)
FO2D Permanent easement agreement - Property held jointly (Word)
Transmittal for final easement approval
Electric
Application for gas & electric line extension
Electric load data form
Landscaping around electrical equipment
Request for attachment to streetlight pole
Request for attachment to utility pole
General
Bill of sale
Building plan set review information
Construction plan screening & checklist policy
Development charges
General notes: Preliminary utility plan
Preliminary utility plan checklist
Request for removal of utilities for demolition or construction
Request service availability letter
Transmittal for approved construction plan inspection submittal
Utility service plan checklist
Natural gas
Application for elevated pressure approval
Application for gas & electric line extension
Application for service line – Approval
Nonpotable water
Application for nonpotable water availability
Nonpotable water construction drawings
Nonpotable water construction plan checklist
Nonpotable water plan notes
Nonpotable water plan signature blocks
Notice of acceptance of application for availability
Notice of private nonpotable water system
Wastewater
Checklist for upgrading/replacing service lines with trenchless technology
Example grease interceptor sizing formula
General notes for sanitary sewer service lines
Notice of private sanitary sewer system
Transmittal for approved construction plan inspection submittal
Transmittal for final design approval
Utility service plan checklist
Wastewater construction drawings
Wastewater construction plan checklist
Wastewater - General & project specific notes
Wastewater master facility form
Wastewater plan signature blocks
Water/Wastewater recovery agreement application
Water
Application for temporary water service
Application for water tapping permit
Backflow prevention assembly form - Domestic use
Backflow prevention assembly form - External & irrigation
Backflow prevention assembly form - Fire line
Commercial water meter sizing form
Dedicated irrigation meter form
General notes for water service installation
Notice of private water system
Private main extension - Water statement
Procedures for materials to be added to the water standards
Transmittal for approved construction plan inspection submittal
Transmittal for final design approval
Utility service plan checklist
Water construction drawings
Water construction plan checklist
Water - General & project specific notes
Water plan signature blocks
Water/Wastewater recovery agreement application