The Kelker to South Plant Transmission Line Project involves constructing a high voltage overhead transmission line to connect two of our existing substations - Kelker (southeast) and South Plant (downtown).
Sustainable Energy Plan
Kelker to South Plant Transmission Line
Key benefits
Transmission structures and lines are among the most visible elements of our electric system. They support the transport of electric power from our generation sources, such as power plants, to customer homes and businesses.
The Kelker to South Plant Transmission Line will provide system reliability and help meet the growing electrical demand in the downtown and western areas of the city.
The new transmission poles will be steel monopoles, which are more reliable, fire resistant, and provide an extended lifespan compared to wood poles.
Project timeline
- 2026: Design, easement and permit acquisitions are in progress.
- Summer/Fall 2026: Pre-construction activities scheduled.
- 2027: Target for completion.
How to engage
We are committed to keeping you informed and providing opportunities for you to have a voice in making utility decisions that impact our community.
To stay up to date with information about the Kelker to South Plant Transmission Line project:
Where will construction start and end?
How will construction impact main roads?
We coordinate with the Colorado Department of Transportation (CDOT) for any work that may impact traffic along major roadways. Much of that work will occur overnight, to minimize traffic impacts.
How will construction impact main roads?
We take extra care to reduce our impact on the environment, wildlife and their habitats.
We avoided wetlands, conservation easements and wildlife areas as much as possible while planning the route.
The design was also adjusted to reduce the number of trees and vegetation disturbed. We are using the minimal amount of land while still maintaining a safe distance from the infrastructure.
Current projects
Kelker Substation Expansion Project
The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands.
More information More information
Austin Bluffs Water System Improvements
We are replacing a large water tank and building a new pump station in Austin Bluffs Open Space to ensure the delivery of safe and reliable water.
More information More information
Distribution Integrity Management Program
To ensure the safety and reliability of our natural gas system, we are replacing bare steel in our natural gas system by 2035.
More information More information
Central Bluffs Substation
The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability.
More information More information
Penrose Water Supply Project
Replacing the Penrose Reservoir with two large water storage tanks will ensure safe, reliable water service while reducing long-term costs.
More information More information
Water Pressure Zone Project
We will begin work in fall 2025 to improve water pressure on the west side of the city near Garden of the Gods Park.
More information More information
Horizon Utility Campus
A location near the Colorado Springs Airport will soon feature 160 acres of resources to provide reliable and cost-effective energy for years to come.
More information More information
Marksheffel Water Main Installation
We are working to improve the reliability of our water system on Marksheffel Road.
More information More information
Dry Creek Stream Stabilization
We're installing concrete and rock structures to protect critical wastewater infrastructure near the Dry Creek Stream in northwest Colorado Springs.
More information More information
Fiber Network
Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ...
More information More information
Star Ranch Pump Station
The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages.
More information More information
Continental-Hoosier System Project
The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system.
More information More information
Midway-Kelker Transmission Line Project
We are upgrading this transmission line to strengthen our electric grid and ensure reliability as energy needs change.
More information More informationColorado Springs Utilities
It's how we're all connected.
