A scenic photo of Pikes Peak under an orange painted sky at sunset. background image gradient

Colorado Springs Utilities Blog

Map titled 'Eastern Wastewater System Expansion Project' Map shows the Cross Town Interceptor, running from the Las Vegas facility to the intersection of Platte Avenue and Peterson Road. The Milton Proby Interceptor runs along that street to 2 lift stations southeast of the airport.

Why we’re building the Eastern Wastewater System Expansion

The Eastern Wastewater System Expansion (EWSE) will provide critical infrastructure needed to serve development on the City's east side. The Eastern Wastewater System Expansion (EWSE) will provide critical...

Read now
Read more from Why we’re building the Eastern Wastewater System Expansion

Put a stake in energy vampires this halloween

These spooky, energy-sucking nicknames are meant to make you aware of the electricity wasted by modern electronics. These spooky, energy-sucking nicknames are meant to make you aware of the...

Read now
Read more about Put a stake in energy vampires this halloween

Socially distanced volunteering? Look no further than Creek Week 2020

Each year thousands of volunteers come out and literally haul away tons of trash from in and around our waterways, and we were happy to... Each year thousands of volunteers come out and literally haul away tons of...

Read now
Read more about Socially distanced volunteering? Look no further than Creek Week 2020

When the leaves are falling, weatherization is calling

Before the frigid temperatures kick-in, here are several ways to improve energy and water efficiency to stay safe and comfortable this... Before the frigid temperatures kick-in, here are several ways to improve energy...

Read now
Read more about When the leaves are falling, weatherization is calling