Resource-Detail-Hero
Water project

Penrose Water Supply Project

Rendering of two covered water storage tanks situated above a wooded area, with access structures visible on top of each tank.We are replacing the 109-year-old Penrose Reservoir with two large water storage tanks to maintain safe, reliable water service while reducing long-term costs.

After landslides damaged nearby pipelines in 2015 and an outlet at the dam malfunctioned in 2023, the dam has reached the end of its useful life. Since 2023, we have operated temporary above-ground pipelines to continue delivering water in the area, which is not a sustainable long-term solution.

Together, the tanks will hold a total of 17.6 million gallons of water safely. The two tanks will be painted oregano green and will be built in the existing footprint of the Penrose Reservoir. 

We also plan to improve drainage and landscaping in the area by building a new stormwater detention pond[tooltip text="Approximately 112 feet by 74 feet in size"] and planting trees, shrubs and grass to help hide the tanks from view and blend into their surroundings.

Project benefits

This project ensures safer, reliable water service for decades to come.

  • Improves safety: The project replaces an aging dam with modern infrastructure.
  • Lowers costs over time: The tanks reduce operation and maintenance costs while improving an important part of our water system.
  • Maximizes water storage: The tanks will maximize water storage capacity and prevent water loss from evaporation.
  • Ensures reliability: Two tanks ensure water service isn't interrupted during maintenance work. When one tank must be emptied, the other continues to store water.

Project timeline

• Aug. 10, 2026: Community members are invited to a public meeting to learn more about the project.

• October 2026: Preparation work begins at the construction site.

• Fall 2026: Construction begins.

December 2028: Construction is completed and testing of water tanks begins.

• Spring 2029: Landscaping work is finished and the project is completed.

Engagement opportunities

We are committed to working with the community throughout this process.

Opportunities include:

• Public meetings.
Permitting comment process.
• Direct outreach to customers.
• Project updates on this webpage, updates via email and other notices.

Public input will help shape decisions, and we will share how feedback influences the project.

If you have any questions or concerns about this project, please contact us at engage@csu.org or (719) 668-7765.

Project renderings

Graphic rendering showing large green round mounds of underground water storage tanks next to sidewalks and green grass.
Rendering of two covered water storage tanks viewed from across a hillside, with trees in the foreground and development visible in the distance.
Rendering of two covered water storage tanks situated above a wooded area, with access structures visible on top of each tank.
Rendering of covered water storage tanks partially screened by mature trees, with rocky mountain terrain in the background.
Overhead rendering showing two covered circular water storage tanks integrated into a sloped site with surrounding vegetation and access roads.
Frequently asked questions

Why is the Penrose Dam being removed?

The Penrose Dam is more than 100 years old and has become unsafe over time. The structure has several problems, including the risk of landslides nearby and aging equipment that no longer works properly. Because of these risks, we took the dam out of service.

Removing the dam will help make the area safer for everyone.

Current projects

Horizon Utility Campus

Horizon Utility Campus

A location near the Colorado Springs Airport will soon feature 160 acres of resources to provide reliable and cost-effective energy for years to come.

More information More information
Austin Bluffs Water System Improvements

Austin Bluffs Water System Improvements

We are replacing a large water tank and building a new pump station in Austin Bluffs Open Space to ensure the delivery of safe and reliable water.

More information More information
Kelker Substation Expansion Project

Kelker Substation Expansion Project

The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands.

More information More information
Water Pressure Zone Project

Water Pressure Zone Project

We will begin work in fall 2025 to improve water pressure on the west side of the city near Garden of the Gods Park.

More information More information
Distribution Integrity Management Program

Distribution Integrity Management Program

To ensure the safety and reliability of our natural gas system, we are replacing bare steel in our natural gas system by 2035.

More information More information
Central Bluffs Substation

Central Bluffs Substation

The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability.

More information More information
Marksheffel Water Main Installation

Marksheffel Water Main Installation

We are working to improve the reliability of our water system on Marksheffel Road.

More information More information
Dry Creek Stream Stabilization

Dry Creek Stream Stabilization

We're installing concrete and rock structures to protect critical wastewater infrastructure near the Dry Creek Stream in northwest Colorado Springs.

More information More information
Fiber Network

Fiber Network

Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ...

More information More information
Star Ranch Pump Station

Star Ranch Pump Station

The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages.

More information More information
Continental-Hoosier System Project

Continental-Hoosier System Project

The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system.

More information More information
Midway-Kelker Transmission Line Project

Midway-Kelker Transmission Line Project

We are upgrading this transmission line to strengthen our electric grid and ensure reliability as energy needs change.

More information More information