Sustainable Energy Plan

Williams Creek Generating Station

400 megawatts of natural gas-based generation

A graphic rendering of four natural gas generators next to a geodesic dome. The generators feature short exhaust stacks next to industrial grade machinery.The Williams Creek Generating Station will include 400 megawatts (MW) of natural gas-based generation similar to the generators on the former Martin Drake Power Plant site.

The technology is highly efficient because they turn on rapidly to meet our peak demand, typically experienced in summer. They also produce lower emissions than other options.

Originally planned for the Horizon Utility Campus, the new generators will be located at our Williams Creek site once they are constructed. 

The 160-acre site is near Lower Williams Creek, southeast of Fountain in unincorporated El Paso County. The area is east of Williams Creek Road and south of Squirrel Creek Road, and is on property already owned by Colorado Springs Utilities.

These additional generation sources are needed to reduce carbon emissions, meet state regulations and to meet the evolving power needs of existing and future customers.

How to engage

Questions or concerns may be directed to (719) 668-7765 or engage@csu.org.

Current projects

Horizon Utility Campus

Horizon Utility Campus

A location near the Colorado Springs Airport will soon feature 160 acres of resources to provide reliable and cost-effective energy for years to come.

More information More information
Austin Bluffs Water System Improvements

Austin Bluffs Water System Improvements

We are replacing a large water tank and building a new pump station in Austin Bluffs Open Space to ensure the delivery of safe and reliable water.

More information More information
Kelker Substation Expansion Project

Kelker Substation Expansion Project

The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands.

More information More information
Water Pressure Zone Project

Water Pressure Zone Project

We will begin work in fall 2025 to improve water pressure on the west side of the city near Garden of the Gods Park.

More information More information
Distribution Integrity Management Program

Distribution Integrity Management Program

To ensure the safety and reliability of our natural gas system, we are replacing bare steel in our natural gas system by 2035.

More information More information
Central Bluffs Substation

Central Bluffs Substation

The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability.

More information More information
Marksheffel Water Main Installation

Marksheffel Water Main Installation

We are working to improve the reliability of our water system on Marksheffel Road.

More information More information
Dry Creek Stream Stabilization

Dry Creek Stream Stabilization

We're installing concrete and rock structures to protect critical wastewater infrastructure near the Dry Creek Stream in northwest Colorado Springs.

More information More information
Fiber Network

Fiber Network

Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ...

More information More information
Star Ranch Pump Station

Star Ranch Pump Station

The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages.

More information More information
Continental Hoosier System Project

Continental Hoosier System Project

The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system.

More information More information
Midway-Kelker Transmission Line Project

Midway-Kelker Transmission Line Project

We are upgrading this transmission line to strengthen our electric grid and ensure reliability as energy needs change.

More information More information