Fiber Network

We’re building a digital utility of the future.

Our new fiber network will enhance utility operations, allowing us to better serve customers and meet the needs of our thriving community. Once complete, Colorado Springs will be one of the best-connected cities in the country. The investment in this infrastructure will support long-term operational needs and sustainable energy goals.

We’re building this network in a way that significantly offsets costs by leasing extra capacity to partners like fiber internet provider, Ting Internet. 

 Visit Ting.com to learn more and check availability of gigabit internet at your address.  

If you have questions about this project, please call our Customer Service Center at (719) 448-4800
Map focused primarily on the north side of Colorado Springs. The map contains two zones, one shaded gray, the other light blue. The gray area reads "on hold" and comprises North gate, Flying Horse and Briargate neighborhoods. The active build areas include the Rockrimmon neighborhood, and an area north of Cottonwood Creek Park, east of Black Forest Road and primarily north of Woodmen Road.

Fiber network construction

Active construction is underway in the area of the map shaded in blue. Construction in the area shaded in gray is currently on hold.

What to expect during underground construction

Most of the construction of this network will utilize underground boring. Generally, residents can expect the following sequence of work: 

Pre-construction 

Residents will receive a door hanger letting them know that construction will begin within the week.

To avoid damaging existing utility infrastructure, utilities will be located with special locate paint and flags. This paint is designed to be temporary and will fade with time and exposure to the elements.

Utility Locators may need to access the meters in your backyard.  

Underground drilling

Constructions crews excavate and utilize directional drilling to lay conduit that will contain fiber technology. This work will occur in the utility right of way and easements. Residents can expect construction crews with heavy equipment (vac trucks, drills, water trucks, etc.) on trucks and trailers in the area. Traffic may be disrupted, and residents might be asked to move their vehicles to prevent being blocked in.

Installation of utility structures and fiber placement

Utility structures that contain fiber technology will be placed in easements. Then fiber will be installed the underground conduit and structures.  

Repair and restoration 

Contractors will restore disturbed landscaping, irrigation, and hard surfaces. Full restoration of vegetation and irrigation can only be completed in warm weather months.  

What to expect during aerial installations

Fiber optic cable installation may occur on utility poles in your area. Utility poles are in easement areas, typically in alleyways. 

  • Installation work will involve specialized equipment, including bucket trucks, and may require temporary access to backyard areas. 
  • Our contractor will attempt to contact you directly if backyard access is needed. 
  • Estimated Duration: installation on utility poles is expected to take approximately 1-2 days per property. 
  • There may be temporary noise and minor disruptions during the installation process.

  • Access may be temporarily restricted while work is being performed in easement areas. This may include temporary alley closures.

Report landscape damage

Please use our customer issues intake form below to report damage caused by fiber construction.

Customer issues intake form

Questions & Answers

Will Colorado Springs Utilities provide internet service?

No. We are not an internet service provider. We are building a city-wide, high-speed fiber network to support our operational needs. Excess capacity on this network is leased to Ting Internet, who may offer consumer and business internet service. Once your neighborhood is serviceable, Ting Internet has the opportunity to extend fiber lines directly to homes and businesses to provide multi-gigabit internet service.

Current projects

Horizon Utility Campus

Horizon Utility Campus

We are working to develop a campus near the Colorado Springs Airport to provide you with reliable, cleaner and cost-effective energy for years to ...

More information More information
Austin Bluffs Water System Improvements

Austin Bluffs Water System Improvements

We are replacing a large water tank and building a new pump station in Austin Bluffs Open Space to ensure the delivery of safe and reliable water.

More information More information
Kelker Substation Expansion Project

Kelker Substation Expansion Project

The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands.

More information More information
Water Pressure Zone Project

Water Pressure Zone Project

We will begin work in fall 2025 to improve water pressure on the west side of the city near Garden of the Gods Park.

More information More information
Distribution Integrity Management Program

Distribution Integrity Management Program

To ensure the safety and reliability of our natural gas system, we are replacing bare steel in our natural gas system by 2035.

More information More information
Central Bluffs Substation

Central Bluffs Substation

The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability.

More information More information
Marksheffel Water Main Installation

Marksheffel Water Main Installation

We are working to improve the reliability of our water system on Marksheffel Road.

More information More information
South Catamount Dam Rehabilitation Project

South Catamount Dam Rehabilitation Project

We are completing necessary maintenance and improvements to South Catamount Reservoir, preserving and extending the life of the dam for decades to ...

More information More information
Fiber Network

Fiber Network

Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ...

More information More information
Star Ranch Pump Station

Star Ranch Pump Station

The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages.

More information More information
Continental Hoosier System Project

Continental Hoosier System Project

The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system.

More information More information
Midway-Kelker Transmission Line Project

Midway-Kelker Transmission Line Project

The Midway-Kelker transmission line project supports the Sustainable Energy Plan (SEP) goal to provide safe and reliable energy systems.